Scope of works performed:

  • 36 Month Project
  • Principle Contractor.
  • Design documentation including grading studies
  • 6 x new 4000A Consumer Mains
  • 9 x New 4000A Main Switchboards,
  • 6 x New Power Factor Correction Units
  • 5 x New Generator Switchboards,
  • 29 x New ATS replacements and in new Switchboards,
  • 16 x New Manual Transfer Switches
  • 32 x New Specialised Services MDBS and Switchboards
  • 8 x Tenant Load Shedding switchboards
  • 6 x New Specialised MCC Switchboards
  • New House UPS system
  • New House Switchboards
  • New Tee off boxes
  • New House and Tenant Risers,
  • New Energy Monitoring System and meters
  • New PLC and Scada Control Systems including 6 x PLC panel switchboards
  • 6 x 1000kVA Generator Synchronisation over three different floors
  • Generator Starter and DC Battery System Replacement
  • Generator Fuel System Replacement
  • Moving and Re terminating 36 x MIMS cabling
  • Dual Redundant Fibre Backbone and control cabling for PLC – SCADA systems
  • General Light and Power