Electrical Infrastructure Upgrade Project
Client: Dexus
Location: Sydney CBD
Contract type: Design and Construct
- Barnwell Cambridge was engaged to complete the replacement of the 6 Main switchboards & Distribution boards, generator boards & associated PLC generator controls systems.
- It was important that the works did not affect the normal operation of the 8 Levels of Retail & the 67 levels of the Commercial building.
- The time invested into the detailed design greatly assisted with the install of new infrastructure into the oddly shaped and spatially constrained existing plant rooms.



